PHASE 3
RENO CHECKLIST
ORDER OF OPERATIONS
-
The order of operations is crucial! We believe in full transparency, ensuring our clients understand the extensive preparation involved before construction even begins.
-
The behind-the-scenes work is essential to laying a solid foundation for the project.
-
Additionally, following a well-planned sequence during the kitchen assembly is vital to ensure everything is executed correctly, avoiding costly mistakes and ensuring a smooth, efficient renovation.
1: demolition
-
Remove old cabinets, countertops, appliances and flooring​​
-
Disconnect utilities (water, gas, and electricity)
-
Taking precautions to protect surrounding areas from dust and debris.
2: structural work
-
Address any structural changes like removing walls or adding beams
-
Check for and resolve any damage (e.g., water damage, mold, or pests
3: rough-in work
-
Plumbing: Install or reroute plumbing for sinks, dishwashers, and refrigerators
-
Electrical: Run wiring for outlets, lighting, and appliances
-
HVAC: Adjust or install new ductwork if required
4: inspection
-
Schedule inspections for plumbing, electrical and structural work as required by local building code
-
Address any issues identified during inspection
5: construction
-
Drywall
-
Painting
-
Cabinetry + Hardware
-
Flooring
-
Appliances + Fixtures (sinks, faucets, garbage disposals, vent hoods/ventilation)
-
Backsplash
-
Lighting + electrical finishes
-
Final Touches (trim, baseboards, decorative elements, paint touch-ups)
6: final steps
-
Final inspection and walkthrough, ensure everything is as per code.
-
Address any final list items with contractors
-
Deep clean to remove all dust and debris
-
Finally... MOVE IN!